Shilpa Layout ROB — Phase 1 & Phase 2
General Engineering
Project
Shilpa Layout ROB — Phase 1 & Phase 2
Structural steel fabricated and supplied for the Road Over Bridge at Shilpa Layout, across both Phase 1 and Phase 2. Built-up plate girders were fabricated to approved drawings, drilled for site splices, inspected stage-wise and primed before being dispatched as erection-ready assemblies.
General Engineering
At a glance
- Industry
- General Engineering
- Scope
- Design, fabrication & dispatch
- Quality system
- ISO 9001:2015 Certified
- Inspection
- Stage-wise + third-party
Drawings, QAPs and material test certificates for this class of work are available on request.
Work Photographs
From the shop floor
Tap any photograph to view it full size.
More in General Engineering





